You may have spent years walking Chastain Park. Do you know where its 30 unwalked acres are?
They sit between the 16th hole of the golf course and Nancy Creek. The park was first built in the 1940s as a Works Progress Administration project. It covers 268 acres, which makes it Atlanta's second-largest public park. The Chastain Park Conservancy says it draws more than 3 million visitors a year. Even so, this one piece of it has stayed out of reach. The Conservancy calls its plan for the land the Palisades, a "park within the park." The work begins somewhere most neighbors already know well: the road down to Farm Chastain.
Why you've never walked it
The short answer is that there has been nothing to walk on. Lord Aeck Sargent, the landscape architecture firm that designed both the park's master plan and the Palisades, describes the site as "a large 80-year-old dumping ground" inside an upland forest it calls "significantly unhealthy and ecologically challenged." In June, Rough Draft Atlanta reported that kudzu and ivy cover the area and that it is "almost entirely inaccessible on foot."
The idea of opening it up has been around for a while. Rosa McHugh, the Conservancy's president and CEO, told Rough Draft Atlanta that the space in the middle of the golf course "was seen as an opportunity in 2008." The Conservancy returned to it during the park's recent comprehensive plan process. That plan is called Discover Chastain. Atlanta City Council adopted it on Nov. 3, 2025, as legislation 25-O-1492. The month before, NPU-B had voted 17–3–1 to support it. In Lord Aeck Sargent's words, the plan is meant to unlock "thirty acres of previously-inaccessible parkland."
The first change is a drive you already take
Before anyone can walk the Palisades, the park has to fix how people get to that part of it. Rough Draft Atlanta reported that the only road cars can use to reach the lower half of the park runs through the Chastain Park Golf Course, which it called one of the busiest public courses in Atlanta. Anyone who has driven to Farm Chastain for a workshop or parked to start the PATH loop has used that road.
The Conservancy's Nov. 12 update calls the realignment of that road "the first step toward establishing access to the Palisades." Here is what the new route is meant to do for people who already use this end of the park:
- PATH trail users get safer access to PATH parking.
- Farm Chastain visitors get safer access to the garden at 4001 Powers Ferry Rd NW.
- People on foot get their own dedicated pedestrian path along the new alignment.
- Golfers get the old road back as fairway once the asphalt is removed.
Earlier Conservancy plans also include a new entrance drive and a parking area serving the Conservancy offices, Farm Chastain and the new trail system. The new road has no name yet. The Conservancy is offering the naming rights as a donor opportunity.
What the new loop will lead to
Once the road is in place, the Palisades becomes a loop that starts from trails you already know. Lord Aeck Sargent describes a new Palisades Trail Loop that "connects an existing peripheral park trail system" and then runs into new ground. Here is the order you would walk it in, based on the designer's description:
- Lowland forest. The loop leaves the existing trail and heads down into the woods along Nancy Creek.
- The bridge. A new 153-foot pedestrian bridge spans Nancy Creek, which the plan also restores. In its April update, the Conservancy referred to it as the Sam Massell Bridge.
- The Terraced Glade. This new opening in the forest replaces a former dumping pit, and the contaminated soil there is remediated as part of the work.
- The Oval Overlook. The designers call it the centerpiece and "living room" of the Palisades. It is an oval event lawn about 40 feet above Nancy Creek, with views across the golf course and north through the rest of the park.
All together, the plan calls for about a mile of trail through mature forest. Along it are a native tree arboretum, a natural play space for children, native and pollinator gardens, and open lawn for gatherings. The April update also lists an outdoor classroom.
Much of the work is restoring the land itself. The Conservancy lists stormwater improvements, invasive-plant management, native planting and more than 500 new trees. McHugh told Rough Draft Atlanta that she wants to favor plants with "color and interest" so the park offers something new in each season. Native flowers have already been planted around the park's edges.
"What we're trying to do is create a park within the park. That's our goal, to really have this be the heartbeat of the park, where you can just go and be and enjoy and be this place for mental health, where you're really in nature."
McHugh gave that description to Rough Draft Atlanta in June. It fits the request people made most often during the planning process. In its July update, the Conservancy wrote that the community consistently asked for more passive greenspace and more places to walk.
The calendar for the north end
In July, the Conservancy said construction was expected to start on Nov. 1 and to take 12 to 16 months. WSB reported the same schedule in August. SG Contracting is the builder. The Conservancy says it will share details about an official groundbreaking celebration through its own channels.
The money is close to fully raised. As of July, the Conservancy had raised more than $12 million and had about $1 million left to reach its goal. Rough Draft Atlanta has described the full campaign as $13 million.
There is a separate item on the City of Atlanta's tree removal postings, a list of proposed removals of healthy trees on public land. A project called "Chastain Park Streambank Restoration" was posted there on Oct. 29, 2026, at the Farm Chastain address, 4001 Powers Ferry Rd NW. The listed deadline to appeal was Nov. 13. The city's page links to a PDF with the details for anyone who wants to see what is planned along the stream.
Holiday Chastain, on the side of the park that's already finished
The Conservancy's last big rebuild is a good place to spend an afternoon before the Palisades opens. The rebuilt Chastain Park Playground, with its treehouse back in place, had its ribbon cutting scheduled for May 1, 2025. The Conservancy's 2025 impact report says the renovation added shade structures and improved accessibility, comfort and year-round use.
On Saturday, Dec. 5, the playground hosts Holiday Chastain from 1 to 4 p.m. The event is free, with hot chocolate, cookie decorating and family activities.
If you want to see the Palisades site before it opens, the Conservancy offers site walks and golf cart tours on request. You can read more about how the park shapes daily life nearby in our guide to living in Chastain Park. Our Chastain Park neighborhood page covers the streets around it.
At Team Rich Richardson, we follow projects like the Palisades because a new trail, a rebuilt creek crossing or a relocated park road changes how nearby streets get used. If you live near the north end of the park and want to talk through what this project could mean for your home, Rich's architecture background helps us look at the details, starting with how your property sits relative to the park. Reach out anytime, or start with an instant home valuation.